In November 2023, Aureos were appointed to deliver the Construction and Testing elements of the project, which looks to ac...
The London, Tilbury and Southend (LTS) railway was electrified with a mixture of 6.25kV AC and 25kV AC overhead line equip...
Project Scope NORWICH VICTORIA SIDINGS – DESIGN ENGINEERING & CONSTRUCTION Keltbray was awarded the £8M multidisci...